1. 
    
  2. <dd id="dyolg"><address id="dyolg"></address></dd>
  3. <center id="dyolg"></center>

  4. OA
    CN

    Danger elimination and reinforcement project of key (II) reservoir in Duchang County

    Danger elimination and reinforcement project of key (II) res...
    Danger elimination and reinforcement project of key (II) reservoir in Duchang County,the total construction period is 165 days and the total investment is 2814399.28 Yuan.

    The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city

    The Renovation project from Binjiang hotel to Guantang secti...
    The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city is located in the urban area of Guanyang County, with a total construction period of 30 days and a total investment of 18132288 Yuan.

    Small Hydropower station in Anhua County, Hunan Province

    Small Hydropower station in Anhua County, Hunan Province
    Small Hydropower station in Anhua County, Hunan Province.

    High standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011

    High standard farmland construction demonstration project of...
    The total construction period of high standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011 is 120 days and the total investment is 3675699.44 Yuan.

    Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project

    Yichun Shanggao County in 2011, 40 small reservoirs reinforc...
    Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project, with a total investment of 4144142.57 Yuan.

    Longtan Hydropower Station in Guangxi Province

    Longtan Hydropower Station in Guangxi Province
    As the "West-to-East Power Tansmission" landmark project and the key project of the western development,Longtan Hydropower Station is the second largest hydropower station in China following the Three Gorgers Hydropower Station. The design water level is 400 meters, the dam height is 216.5 meters, the dam crest length is 836 meters, the storage capacity is 27.3 billion cubic meters, the installed capacity is 6.3 million kilowatts, and the annual power generation capacity is 18.7 billion kilowatt-hours.
    目前在第1頁, 共有1頁, 共有6條記錄 第一頁 上一頁 1 下一頁 最后一頁 跳轉到
    AV日本乱人伦片中文三区_诱人的女邻居中文字幕_久99视频精品免费观看_五月丁香六月缴情综合在线